Thursday, November 20, 2008
Under Construction: Waalkes Update
B & B Keg Cooler

Perhaps one of the more unusual projects I've done is the new keg cooler expansion for B & B Beer Distributing in Grand Rapids, to be built by First Companies. The new 648 sf cooler could hold more than 1600 kegs of beer. This equates to over 264,000 12 oz beers. As of the 2000 census, the population of Grand Rapids was 197,800; of which 132,000 were over the age of 21. That equates to approximately 2 beers for everyone in Grand Rapids. So don't worry, once the project is completed you can rest assured that B & B has a couple chilled for you.
Upcoming Industrial Project

I've completed drawings for a new 30,000 sf office, showroom, and warehouse building on the Beltline to be constructed by First Companies. This will be a very nice facility, and I'm looking forward to the ground breaking. More details later.
.
Wednesday, November 19, 2008
Jeup Furniture Under Construction
Jeup Furniture, a project I worked on while designing for Dixon Architects, is now under construction and coming together wonderfully. Joe Jeup has as good of an eye for building design as he does for furniture design. This is probably one of the nicest industrial buildings I've worked on yet. Congratulations to Jeup Furniture, First Companies, and Dixon on what's shaping up to be a great project.
.
Tuesday, October 07, 2008
Clark Manufacturing Wrapping Up

.
Congratulations to Clark Manufacturing on their beautiful new facility. The project, built by Lakewood Construction, is nearing the final phases of completion. I'm pleased with the building overall, but most impressed with the new cranes. This was one of the last projects I designed while working with Dixon. I'm glad to see it's come together so well.
Monday, August 04, 2008
O'Brien Residence is taking form

Preliminary Drawings for the O'Brien residence addition are underway. I think we've come across a form that works well with the context of the existing house, and adds to the overall composition.
Wednesday, July 30, 2008
Under Construction: Waalkes Residence
Demolition has begun on the Waalkes house remodel! They've salvaged hundreds of bricks from the former garage to use on the front of the new portion of the house. Here we're seeing a pile of rubble where the one stall garage used to be.
I'm excited to see it start to take shape.
Friday, July 18, 2008
Going Green
Stay tuned!
On the Boards: O'Brien Residence

Design work has begun on a new addition for the O'Brien family home. The addition will involve all new kitchen, dining, and living space, as well as extra childrens bedrooms and a new master suite.
Allen Extruders

Starting Construction:
Maxam Architecture completes drawings for Allen Extruders. The plastics manufacturer is adding an additional 17,196 square feet of manufacturing space and 12,265 SF of covered outdoor shipping areas to their existing facility. Allen Extruders is headquartered in Holland, MI.
Friday, April 25, 2008
Waalkes and Work on the Boards

Work is coming along nicely on the Waalkes residence remodel. The home will get a new dining room, vastly more open kitchen, a face lift to the dated fireplace, and a 2 stall garage. The before and after images are sure to be stunning.
Work on the Boards: A fresh batch of preliminary designs... 3 industrial facilities, a retail center, and possibly some Leed consulting. I'll post details as they firm up and once contracts are signed and the 'veil of secrecy' is lifted.
Sunday, April 13, 2008
Maxam Architecture has Launched!

I've finally struck out on my own and launched Maxam Architecture. Thanks to all who have helped me get established!

The new office is located at 25 Ottawa SW, Suite 303. Its the building just west of the arena and just north of Bistro Bella Vita. I'm co-located with the Bird Design and Clark Communications. Its a very creative group, and will be great for keeping the inspiration flowing. The office itself has a great contemporary feel and will work great for client meetings. I'm looking forward to my first batch of projects!
My new email is david@maxamarchitecture.com


.
Friday, November 09, 2007
Getting Green
I've passed the LEED exam and am now a LEED Accredited Professional.
However, before I become another vocal advocate of the green revolution, I must admit there is a part of me that is skeptical of 'Green.' The heavy emphasis that 'Green Building' has been getting in the world of design is a great boost to architecture, but also a minor curse. Green is great, but it is not all architecture is. Making a building energy efficient doesn't necessarily make it a great building. Architecture is more than the engineering that goes into it. Designing a building to be energy efficient and environmentally friendly is a great leap forward; but it is not the whole of architecture. Making a building that is just efficient is good engineering. Combined with good architecture, it can produce a great building. Lets not forget the Architecture in the rush to Green.
Monday, October 22, 2007
Islamic Cultural Center - Behar

For the curious among you, here are some renderings of the ICC Behar mosque that I've been working on. It's an entirely concrete structure, complete with a concrete dome and minarets. The design team was invited to a fund raiser dinner, where I was asked to speak to a crowd of a few hundred about the design. I'm not one to shy away from public speaking, but trying to explain a fairly high concept architectural design through a translator was an interesting experience. You have to slow down and space your sentences into easily translated blocks. Explaining the magnificent mathematical perfection and historical references of a parabolic arch through a Bosnian translator; Forget about it.
I've often heard that in Europe architecture as a profession is given a great deal more respect than it gets in the United States. It certainly is the case with this Bosnian Islamic congregation. I've worked with some very grateful and pleased clients before; but the ICC Behar are wonderfully grateful and gracious clients who display an amazing heartfelt gratitude for all the work we've done for them. I wonder if part of that is rooted in the more European view of the profession of architecture.
Tuesday, August 07, 2007
Update
I'll post renderings of some of my recent work later, at least for the stuff thats public. Once the 'veil of secrecy' on some projects in the early stages becomes solid and the contracts are signed, I'll have more to post.
Saturday, April 14, 2007
Grand Haven Cottage
I recently completed a cottage design for a dune lot in Grand Haven overlooking Lake Michigan. The lot is up for sale and listed at GRAR.COM
The site has an incredible amount of slope to it, and is regulated by the Department of Environmental Quality as a protected dune site, which limits the area in which you can build. Therefore the design keeps as small a footprint as possible.
Thursday, November 02, 2006
Registered Architect

8 1/2 Years of College...
$75,000 dollars.
3 Years NCARB intern program fees...
$450 dollars.
9 Registration Exams and study guides...
$2,150 dollars.
Finally being able to call yourself an Architect...
Priceless.
12 years after starting as an apprentice draftsman, I can now call myself an Architect. The path to becoming an architect involved 8 years of being an apprentice draftsman and project manager, 2 college degrees, 3 years being an 'intern architect' and sending credit reports to the NCARB national council, and 9 exams on topics ranging from design to structural engineering. "Architect" is a title protected by state government by a 'title law,' meaning its illegal to present yourself as an Architect without going through the hoops and obtaining a state license. The State licenses architects in order to "protect the health, safety, and welfare of the public" as the phrase goes. It's similar in concept to the legal requirements for being an M.D. in order to prevent quack doctors from killing people.
It's a huge relief to have jumped through that final hoop and finished the goal I've been working towards all these years. Perhaps it's time for a vacation, or better yet some nice big commercial projects to help pay off those student loans.
Dixon Architecture
As some of you have heard, I've starting working with Ken Dixon and his crew over at Dixon Architecture. I'm currently working on 2 monstrous precast concrete manufacturing facilities, some bank work, and a few other miscellaneous projects. I'm really digging my teeth into the large scale commercial work again after having spent the past year doing residential.
Posted here is my design for one of the manufacturing facilities. The client hadn't been satisfied with any of the sketches he had seen to date. So when I came on board I boiled down the numerous different looks and concepts that had been developed for the project so far. I kept some of the concepts, further developed some, and tossed some other out completely. The result was this sleek modernist design. Night and dawn views of a building like this do wonders to show off what might otherwise seem like a fairly boring concrete box, if seen only as a basic line drawing or in a sketchy form. Some projects show off much better with a 'warm fuzzy' sketch, but in this case the crisp photo-rendering definitely came through to really communicate the clarity of the design.
.
Sunday, October 01, 2006
Ncarb Testing Completed

I've received my 'Pass' letter for the last of the 9 test administered by the National Council of Architectural Registration Boards required to become a licensed architect. Just a few paperwork hoops left to jump though and I'll be able to call myself an 'Architect.' The title Architect is protected by a title law, and calling oneself an architect without holding an architects license is similar to posing as a medical doctor. Architects are licensed by the states in order to 'protect the health, safety, and welfare of the public.' Obviously it's not in the best interest of the public to have any yokel designing public buildings. Perhaps I'll post more later on the path to becoming an architect, for those who might be curious about such a cryptic subject.
Tuesday, September 19, 2006
Lakefront Living in Wisconsin
My latest project was to take a floor plan designed by a fine home builder in
I’ve been on somewhat of a Craftsman kick lately for residential projects. Either I’m developing a style, or I’m just stuck in a stylistic rut, depending on your point of view. Either way, these Craftsman designs seem to be working very well. They have enough detail and style to be charming, and yet can still be reasonably straightforward so as not to blow the project budget.
The color renderings are shots of the final design I developed. When given the chance, I prefer to design homes with a bit more of a contemporary flair to them, such as the Laverty Cottage, Merkebee House, or Orsini Residence. But even these more modern designs still have some Arts and Crafts overtones.
Click the comments link below to add your public comment.